Ready Transform Your Project Management Skills?

Master Delay Analysis & Claims Management in Projects

Learn how to analyze project delays, manage claims, and protect your project timelines using Primavera P6. This course combines technical scheduling methods with real-world contract management practices.

Instructed by:

Mr. Waqas Ahmad

With over 14 years of industry experience, a leading expert in Project Planning & Control, specializing in Primavera P6, Trained over 2,000 students globally. 

📢 Hurry Up! Only 15 Slots for Our Upcoming Batch! Just 7 Spots Left…

Why Delay Analysis & Claims Management Course Matters?

Delays are inevitable in large-scale projects, but how you handle them defines your project's success. This Delay Analysis & Claims Management Course using Primavera P6 equips you with the tools to perform accurate delay analysis, prepare EOT claims, and support dispute resolution with confidence.

 

Apply delay analysis methods directly within Primavera P6

Avoid contract breaches and costly claims rejections

Learn industry-accepted techniques like TIA, As-Built Windows, and more

Ensure alignment with FIDIC and other contract standards

What You’ll Learn in This Course

Get practical, job-ready skills to manage complex maintenance and shutdown projects using Primavera P6.

 

Core concepts of project scheduling

Delay types and root cause identification

Basics of claims preparation and structuring

FIDIC-based entitlement principles

EOT and cost claim essentials

Schedule quality checkpoints

Key delay analysis techniques

Using Primavera P6 for delay diagnostics

TIA, Windows, and As-Built analysis in P6

Important:

Why Delay Analysis & Claims Management Course is Essential for Your Success?

Projects often exceed their contractual timelines, leading to increased costs and stakeholder disputes. Our course equips you with the expertise to manage these challenges head-on, ensuring you can confidently handle:

Extension of Time (EOT)

Learn how to apply for and justify extensions of time, helping to mitigate the impact of project delays.

Monetary Claims

Understand the process of claiming additional costs due to project delays and how to substantiate these claims effectively.

Become the Go-To Expert in Delay Analysis and Claims Management in Your Industry.

📢 Hurry Up! Only 15 Slots for Our Upcoming Batch! Just 7 Spots Left…

Course Modules Overview

(Everything you'll learn Lecture Wise, inside this Course)

    1. Course Introduction and Scope
    • Overview of the course and learning objectives.
    • Who should take this course and necessary pre-course skills.
    • Benefits of mastering delay analysis.

    1. Project Schedule Management Overview
    • Importance of project scheduling in construction and engineering.
    • Key terms: Critical Path, Float, Baseline.
  •  
    1. Understanding the Project Development Cycle
    • Phases: Feasibility, Concept Engineering, FEED, Detail Engineering.
    • Extracting quantities and estimating for delay analysis.

    1. Role of Contractual Documents in Scheduling
    • Key contract documents in project phases: Bid, Engineering Estimate, Contract Documents.
    1. Types of Contracts and Their Implications
    • Major contract types: Lump Sum, Cost-Plus, Time and Material.
    • Contractual priorities for claims and delay analysis.

    1. Importance of Document Control
    • Structuring and organizing documents for delay analysis.
    • Prioritizing contract documents for validation.
    1. Introduction to Delay Analysis Techniques
    • Critical Path Method (CPM) for delay identification.
    • Establishing and managing project baselines.

    1. Essential Scheduling Quality Checkpoints
    • Key checkpoints to ensure accurate schedule analysis.
    • Review and validation of project baselines
    1. Project Quality and Documentation in Claims
    • Documenting and collecting data to support delay claims.
    • Importance of maintaining contemporaneous records.

     

    1. Delay Claim Preparation Basics
    • Structuring delay claims: Cause, Effect, and Entitlement.
    • Effective use of schedules in supporting claims.
    1. FIDIC Contract Standards
    • Introduction to FIDIC and its different versions.
    • General rules and guidelines for claims under FIDIC.

    1. Claims Entitlement and Preparation 
    • Employer’s entitlement to claims.
    • Contractor’s entitlement to claims.
    • Extension of Time (EOT) claims and their importance.

    1. Data Management for Claims
    • Importance of contemporaneous records.
    • Effective data preparation and documentation.
    1. Key Responsibilities in Claims
    • Engineer's obligations in managing claims.
    • Understanding variations and their impact on claims.

    1. Cost Implications
    • Prolongation costs and recovery methods.
    • Introduction to claim heads and their applications.
    • Recovery of costs associated with delays.
    1. Understanding Construction Schedule Delays
    • Types of delays (excusable, non-excusable, compensable, and non-compensable).
    • Identifying and analyzing root causes of delays in construction projects

    1. Contractual Clauses for Delay Analysis
    • EOT and delay analysis-related clauses in contracts.
    • Overview of delay analysis methods and their applications in concluding EOT.
    1. Concurrent Delays
    • Concepts and history of concurrent delays.
    • Techniques for analyzing and mitigating concurrent delays.

    1. Methods for Concluding Delay Analysis
    • General overview of methods for implementing delay analysis applications.
    • Strategies to conclude EOT and close delay claims effectively.
    1. Claims Documentation and Submission
    • Structuring claims documentation for clear presentation.
    • Techniques for effective communication of claims in negotiations.

    1. Finalizing Claims
    • Case studies on successful and unsuccessful claims.
    • Lessons learned and best practices for future projects.
    1. As-Planned vs. As-Built Analysis
    • Steps to compare the original schedule (as-planned) with actual progress (as-built).
    • Using P6 to highlight deviations and assess delay impact.
    • Reporting and interpreting results.

    1. Time Impact Analysis (TIA)
    • Introduction to TIA and its application in delay analysis.
    • Inserting hypothetical delays and assessing impact on project completion.
    • Using Primavera P6 to create snapshots of schedule impact over time.

    1. Window Analysis Technique
    • Segmenting the project timeline for detailed analysis.
    • Evaluating delays within specific time “windows.”
    • Applying P6 filters and layouts for accurate window analysis.

    1. Impacted As-Planned Analysis
    • Understanding the impacted as-planned methodology.
    • Adding delays to the as-planned schedule to visualize potential impacts.
    • Using P6 to quantify and document delay effects.

Equip Yourself with the Knowledge to Resolve Project Disputes and Manage Claims Confidently.

📢 Hurry Up! Only 15 Slots for Our Upcoming Batch! Just 7 Spots Left…

Who Should Enroll in Delay Analysis & Claims Management Course Course:

Project Engineers

Enhance your ability to manage complex projects and handle delays effectively.

Contract Engineers

Gain the expertise to interpret and manage contract terms related to delays and claims.

Planning Engineers

Improve your skills in creating and managing project schedules using Primavera P6.

Cost Engineers

Learn how to analyze and justify additional costs due to project delays.

Lawyers

Understand the technical aspects of project delays and claims to better represent your clients.

Freelancers working in Construction Industry

Equip yourself with advanced skills to handle project delays and claims management independently.

Unlock the Full Potential of Primavera P6 for Effective Delay and Claims Management.

📢 Hurry Up! Only 15 Slots for Our Upcoming Batch! Just 7 Spots Left…

This course is ideal for professionals managing schedule-sensitive projects in:

Construction – Residential, commercial, and infrastructure

Oil & Gas – EPC and shutdown projects with high delay risk

Power & Utilities – Plant construction and commissioning

Transportation – Road, rail, and airport projects

Engineering Consultancies – Supporting clients in claims prep

Government/Client-side Teams – Evaluating contractor claims

See what People Say about our Mentoring Program...

Learn How to Navigate Complex Project Delays and Ensure Successful Outcomes.

📢 Hurry Up! Only 15 Slots for Our Upcoming Batch! Just 7 Spots Left…

Key Features of This Training

1. Live instructor-led classes

2. Primavera P6 access for practice

3. Practical hands-on exercises

4. Downloadable training materials & templates

⁠5. WhatsApp chat support

6. ⁠Self-study guides

7. ATS CV creation guides

8. Job hunting tips for engineers

9. P6 layouts for delay tracking & forensic analysis

Prerequisite:

You must know following knowledge before get into learning this skills:

Don't Have the Prerequisite Knowledge?

No worries! Visit our website to explore other foundational courses tailored to your field:

Project EPC Planning Control using Primavera 6/Construction

A foundational course that covers the basics of project planning and control using Primavera P6.

Plant Shutdown Management using Primavera 6

Learn how to manage and schedule plant shutdowns using Primavera P6, a critical skill for maintaining operational efficiency.

 

MEET YOUR TRAINER

Engr Waqas Ahmad

(International Coach)

With over 14 years of industry experience, Engr Waqas Ahmad stands as a premier trainer in Project Planning & Control, bringing an unparalleled expertise in Primavera P6.

As a standout in the EPC construction field, especially in the Gulf region’s tough onshore and offshore projects, Waqas Ahmad is your key to success in project planning and control.

  • Diverse Project Expertise: From EPC to Shutdown Management
    He has successfully managed large-scale EPC constructions, demonstrated adept shutdown management, and skillfully navigated the complexities of EoT delay claims management.
  • Global Reach as a International Project Management Coach
    Beyond his field experience, Engr Waqas Ahmad trained 2000+ students globally. His international teaching experience includes industry-based training, molding the next generation of project planning professionals.

Waqas Ahmad’s journey is a proof to his dedication, expertise, and passion for sharing knowledge. Join him in this FREE LIVE Webinar for Aspiring Professionals and tap into the wealth of experience he brings, gaining not just insights into your Engineering Career Excellence but a mentor who has walked the path of success.

14+ Years

Of Experience

80k+

Followers

2,000+

Students Trained

📢 Hurry Up! Only 15 Slots for Our Upcoming Batch! Just 7 Spots Left…

"Unlock High-Paying Engineering Jobs in GCC with Primavera P6 Certification"

Success Story

Pricing & Registration

Course Duration: 4-6 weeks

Schedule (Next Batch Start Date):

Fee details: 

 

This course goes beyond theory — you’ll get hands-on training using Primavera P6 to perform delay analysis techniques like TIA, As-Planned vs. As-Built, and Window Analysis with real project scenarios.

While general P6 courses focus on building project schedules, this course specializes in forensic scheduling, claim support, and delay diagnostics — critical for professionals handling disputes, EOTs, and time-related claims.

Yes. The course walks you through the structure, documentation, and technical backing of EOT claims — including narratives, delay logs, entitlement logic, and Primavera P6 layouts.

 

Basic familiarity with P6 is helpful, but not mandatory. The course includes practical walkthroughs of delay-related features, making it accessible for non-experts as well.

 

Absolutely. You’ll learn how to interpret FIDIC clauses related to delays and apply them when preparing or evaluating claims, making this course highly relevant for international contract standards.

 

We use real delay scenarios, construction case studies, and Primavera P6 files to simulate live project environments — so you can directly apply what you learn.

 

Yes. There’s a dedicated module on concurrent delays, their legal implications, and how to handle them in delay analysis and claim preparation.

 

You’ll receive editable templates for EOT claims, delay narratives, schedule impact logs, and sample P6 layouts for delay tracking and forensic reporting.

 

Yes. The course is designed for both sides — you’ll learn how to critically evaluate contractor-submitted claims, spot weak arguments, and defend your position using contractual and schedule-based logic.

 

Yes. You’ll receive a certificate of completion that validates your expertise in delay analysis and claims management using Primavera P6.

 

Hurry up!!! Limited slots are left

Join professionals in the construction industry who’ve advanced their Primavera P6 skills with us.

📢 Hurry Up! Only 15 Slots for Our Upcoming Batch! Just 7 Spots Left…

FAQs

Frequently Asked Questions

Get Consultation!

Whether you need a construction project schedule, a shutdown turnaround plan, or delay analysis for claims, I’m here to help. Get a professional, well-structured, and optimized Primavera P6 schedule for your project today.

📩 Contact me now to discuss your project requirements and get started!

contact from
Please enable JavaScript in your browser to complete this form.
Name
Start typing to see posts you are looking for.