Plant Shutdown Management using Primavera 6

Uncategorized
Wishlist Share
Share Course
Page Link
Share On Social Media

About Course

The Professional Planning Engineer (PPE) Skill for Plant Shutdown Industry has been developed in a manner that will aid planning engineers in gaining the required knowledge, with the help of the real Industry Maintenance techniques and work flow cycle to develop Project Scope data into Maintenance Strategy as per requirement. Production or Manufacturing Industry suffers a lot in terms of Down time so this course specifically focus on Planning scheduling strategy with respect to available Condition to avoid down time and utilize resource with more effective way to improve work environment and Team work.The aim of this advanced Planning Engineer course is to provide planning engineers with

  • Plant Industry Inside Knowledge
  • Management Techniques
  • Primavera 6 & Excel
  • Excel use for Data collection Templates (DPR,WPR MPR)
  • Communication Skills

And right knowledge, content, and support which will enable them to comprehend and apply the theories with Real Industry based practices, thereby transforming them into smart and Pro Active planning engineers in the professional world.

Workshops, Quiz session, Assignments and Brain storming Sessions for project management can be costly and in this way, it is essential to guarantee that the workshop you are going to sign up for will be worth your time and money. There should be a genuine profit for the preparation speculation, which is why this course has been specially formulated while keeping the end benefit of the trainee in mind.

Our Industry Expert Trainer will conduct Live sessions with Learners to help them how to make successful Job Hunt Plans and Online earning plans after learning this skill based training.

Show More

Course Content

Lecture No: 1
• This skill is for Which Engineering Industries? • What is Plant Shutdown and Turn Around? • What is Maintenance and How it is evolving with passage of Time? • Departments which coordinate for successful Maintenance Planning and Execution • Maintenance Data Collection Cycle in Excel • Why Primavera 6 and How to start Planning Scheduling on P6?

  • • This skill is for Which Engineering Industries?
    00:00
  • • What is Plant Shutdown and Turn Around?
    00:00
  • • What is Maintenance and How it is evolving with passage of Time?
    00:00
  • • Departments which coordinate for successful Maintenance Planning and Execution
    00:00
  • • Maintenance Data Collection Cycle in Excel
    00:00
  • Why Primavera 6 and How to start Planning Scheduling on P6?
    00:00

Lecture -02:
• Maintenance Options • Maintenance Types and Failure Modes

Lecture -03 :
• Planning Scheduling Concepts for plant shutdown/Maintenance • Wrench Time • Integrity, Reliability, availability • The role of the maintenance department • Maintenance Strategy Development • Maintenance Strategy Development - Data

Lecture 4
• Cost Effective Maintenance • Planned Maintenance • 6 stages of Maintenance Inspection Task • Planning Scheduling Principles • Relationship of Different Levels of Planning

Lecture 5 :
• Day To Day Maintenance • In-sourcing Versus Out-sourcing • Accurate Estimating • Calculation Of Man Hours • Productivity monitoring • Factors to improve Wrench Time

Lecture 6 :
• Productivity Factor calculation • Impact of Productivity Improvement • Work flow for Maintenance

Lecture 7 :
• Work Identification Flow Chart • Work Planning Flow Chart • Work Scheduling Flow Chart

Lecture 8 :
• Work Execution Flow Chart • Work Closing Flow Chart • Work Review Flow Chart

Lecture 9 :
• Role of Spares and Materials • SPARE PARTS MANAGEMENT • Good Inventory System • Critical Items Evaluation Process/Planned Parts Process • Parts Collection

Lecture 10 :
• Spare Part and Materials • Good Inventory System • Critical Items Evaluation Process • Planned Parts Process • Part Collection Process • Typical Warehouse Inventory • Case Study /Meetings

Lecture 11 :
• Role of Planner and scheduler • Key Performance Indicators for Planning and Scheduling • The Criticality Analysis Process • RAM Challenge • Monitoring of Engineering Maintenance Performance

PART-B

Lecture-01:
• About US • What are you going to learn in this course? • Why You should learn it? • Role of Planning Engineer • Project Management Overview • Primavera 6 Over view • Contract & Documents

Lecture 02:
• Planning Major Knowledge Areas • Scope Management • Contracts & Agreements • Contract Types • Develop WBS • BOQ • BASIC SETING • Calendar Customization

Lecture 03 :
• Activity Loading • Understanding of Process • Design Phase • Procurement Phase • Construction Phase • Dashboard Setting • Fill Down Trick

Lecture 4 :
• Activity Types • Time Scope and Resource Dependency Model • Develop Project Network Diagram • Estimate Activity Duration • Identify Resources • Estimate Cost • Trick (Activity ID &Time , Duration Units)

Lecture 5 :
• Interlink Work Packages • Project scheduling and Options • CPM • Lay outs • Filters • Look Ahead Plans

Lecture 6 :
• Project Milestones • Constraints • Planning Package • PDF XER Excel Import Export • S Curves & Histograms

Lecture 7 :
• Resources • Resource identification • Development in Primavera 6 • Assignment @ Activity Level

Lecture 8 :
• Man hours assignment • Duration Types • Assignment of Cost • Cost Break down Structure • Resource S curves-Histograms • Spread sheets

Lecture 9 :
• Requirement Plan • Stacked Histograms • Activity Code • Cost Account • Resource Assignment • Reports

Lecture 10 :
• Schedule Compression Techniques (Fast Track – Crashing) • Resource Over Allocation • Resource Levelling • Baseline Assignment

Lecture 11 :
Project Progress Updates

Lecture 12 :
• Earned Value Management • Global Change

Student Ratings & Reviews

No Review Yet
No Review Yet

Want to receive push notifications for all major on-site activities?